All 3 Graded Readings

Japan starts nuclear fuel removal from Fukushima

PRINT ALL READINGS (PDF)

Nuclear Reactors - Level 4

A company started removing fuel rods from Japan's Fukushima nuclear power plant. The plant suffered meltdowns after a huge tsunami hit it in 2011. Workers started removing the hazardous fuel rods five years behind schedule. Work was delayed because of many problems with the devices that were designed for the removal operation. High levels of radiation in the area also caused delays and created a "significant challenge" for engineers.

The company is removing seven unspent nuclear fuel rods. There are a total of 1,573 rods at the plant. The rods will be transferred to safer storage pools. The work should be finished in March 2021. The company said: "Everything is going well so far. We will watch the progress at the site as we put safety first. Our goal is not to rush the process but to carefully proceed." It added: "Safety is our priority. We will carefully continue this work."

SPEED READING

Speed 1    |     Speed 2    |     Speed 3    |     Speed 4

MORE

11 online activities    |    8-page printable   (PDF)

Nuclear Reactors - Level 5

A Tokyo power company has started removing fuel rods from Japan's Fukushima nuclear power plant. The plant was badly damaged and suffered meltdowns after a huge earthquake and tsunami hit it in 2011. Workers started removing the nuclear fuel on Monday, five years behind schedule. The work to move the hazardous rods was delayed because of many malfunctions in the devices that were designed for the removal operation. Another factor causing delays was high levels of radiation in the area. This created a "significant challenge" for engineers.

The company is removing seven unspent nuclear fuel rods from the reactor's pool. There are a total of 1,573 fuel rods at the power plant. These rods will be transferred to safer storage pools. The work should be finished by the end of March 2021. A company spokesman said: "I believe everything is going well so far. We will watch the progress at the site as we put safety first. Our goal is not to rush the process but to carefully proceed." Another spokesman said: "Safety is our priority. We will carefully continue this work." Japan's Prime Minister said the country would do its best to rebuild.

SPEED READING

Speed 1    |     Speed 2    |     Speed 3    |     Speed 4

MORE

11 online activities    |    8-page printable   (PDF)

Nuclear Reactors - Level 6

The Tokyo Electric Power Company (Tepco) has started removing fuel rods from Japan's stricken Fukushima No. 1 nuclear power plant. Tepco is the company that operates the nuclear power plant. It was badly damaged and suffered meltdowns following being hit by a massive earthquake and tsunami in 2011. Tepco started the removal of the nuclear fuel on Monday, five years behind schedule. The work to remove and relocate the hazardous rods was delayed because of a whole series of malfunctions of the devices that had been designed for the removal operation. Another factor that caused delays was high levels of radiation observed in the area. Tepco said this posed a "significant challenge" for engineers.

Tepco said it is removing seven unspent nuclear fuel rods from the reactor's pool. There are a total of 1,573 spent and unspent fuel rods stored at the power plant. The rods will be transferred to safer storage pools at the plant. Tepco said the work would be completed by the end of March 2021. A company spokesman, Tomohiko Isogai, said: "I believe everything is going well so far. We will watch the progress at the site as we put safety first. Our goal is not to rush the process but to carefully proceed with the decommissioning work." Another spokesman said: "Safety is our priority. We will carefully continue this work." Prime Minister Shinzo Abe said Japan would do its best to rebuild the area.

SPEED READING

Speed 1    |     Speed 2    |     Speed 3    |     Speed 4

MORE

25 online activities    |    27-page printable    |    2-page mini-lesson



MY e-BOOK
ESL resource book with copiable worksheets and handouts - 1,000 Ideas and Activities for Language Teachers / English teachers
See a sample

This useful resource has hundreds of ideas, activity templates, reproducible activities for …

  • warm-ups
  • pre-reading and listening
  • while-reading and listening
  • post-reading and listening
  • using headlines
  • working with words
  • moving from text to speech
  • role plays,
  • task-based activities
  • discussions and debates
and a whole lot more.


More Listening

Online Activities

Help Support This Web Site

  • Please consider helping Breaking News English.com

Sean Banville's Book

Thank You